20 Megawatts Powerplant, that can be serve the increasing of electrical demand in Yala province.
Client : Siam Tacuma Co.,Ltd. 18 th Floor Krungdhonburi Rd., Klongtonsai Sub district, Klongsam District, Bangkok, 10600 Thailand.
Location : Mumh, Yala Province Thailand.
Construction Management Period : February 2003 - December 2006
Approx.Value of Services : 23,000,000 baht (575,000 US$)
Approx.Assignment Budget : 1,500,000,000 baht (37,500,000 US$)
Hydro power plant project or "Nam Thuen II project" with 1,070 megawatts capacity for electrical power generation in LAO PDR.
Location within country : Lao PDR
Subsidiary to : Promec Energy Co.,Ltd.
Quality Control Period : March - June 2008
Approx.Value of Services : 280 thousand baht
Approx.Assignment Budget : - baht (- US$)
Ethanol manufacturing and distribution factory which can be produced 3 megawatts of power generating itself. Approximately production capacity 200,000 litres per day, cassava is used for a raw material of production.
Client : Impress Ethanol Co., Ltd.
Location : Chacheongsao Province, Thailand
Construction Management Period : March 2008 – November 2010
Approx. Value of Services : 4 Million bath (114,285,714 US$)
Approx.Assignment Budget : 1,600,000,000 bath (45,714,000 US$)
Construction supervision for architecture, structural engineering and system engineering of administration and workshop building, control building, including guard house, fence, gate and project sign.
Client : IRPC Public Company Limited
Location : Rayong Province, Thailand
Design Period : June 2009 – May 2011
Approx.Assignment Budget : 8,000,000,000 baht (200 Million US$)
Design for architecture, structure engineering and system engineering of administration and workshop building, control building, waste storage including guard house, fence, gate and project sign. Design for civil engineering of machine foundation, pipe rack and site drainage system for the combined heat and power project.
Client : IRPC Public Company Limited
Location : Rayong Province, Thailand
Design Period : 22 June – 6 July 2009
Approx. Value of Services : 5,350,000 bath (133,750 US$)
Approx.Assignment Budget : 4,000 Million bath (115 Million US$)
Design for architecture and structural engineering of non-process buildings which consist of Control building, Electrical sub-station, Waste chemical storage and Water treatment building including guard house, fence, gate and project sign.
Client : IRPC Public Company Limited
Location : Rayong Province, Thailand
Design Period : June 2012 – January 2013
Construction Completion : August 2017
Approx.Assignment Budget : 8,000,000,000 baht
Office building for maintenance department in cluding workshop area the building is 2 store height with mezzanine design responsibility includes architecture & interior, structure and mep system engineering , overhead crane and compress air rooftop deck was design to add another floor area
Client : BANGCHAK COPORATION PUBLIC COMPANY LIMITED (BCP)
Location : Bangkok , Thailand
Construction Period : December,2020
Approx.Assignment Budget : 157,000,000 bath
The scope of T4 Wind Farm project were to investigate on all collapse causeways and roads in Wind Farm area with following detail:
1. Inspect the condition of damaged location of road embankment and cause ways then and verify the root cause.
2. Design review of damage location, schematic of the rectification and recommend subcontractor and quotation to do necessary repairs based on design.
3. Prepare punch list and claim of deflect document
4. Prepare report assessing in term of accuracy or finding and offer the recommendation.
5. Design improving for causeways and roads.
6. Preparation of Tendering document and bidding for sub-contractors.
Client : Mammoet (Thailand) Co.,Ltd.For ALE Heavy lift & Transport (Thailand) Co., Ltd
Location : Thepharak district of Nakhon Ratchasima, Thailand
investigation and design Period : May - July 2021
Supervised the construction of wastewater stabilization pond and installed the machines. The capacity of the wastewater treatment system is 12,500 cubic meter per day.
Client : Nobel NC co.,ltd
Location : Chainat, Thailand
Construction Period : December 2021
Approx.Assignment Budget : 220,524,226 bath
The southeast asia largest copper tube manufacture factory. High standard and large capacity, strength then construction consulting was provided by Future Engineering Consultants.
Client :Bangkok Spring Industrial Co.,Ltd.
Location :Bangkok Spring Industrial Co.,Ltd.
Construction Supervision Period :Bangkok Spring Industrial Co.,Ltd.
Approx. Assignment Budget :72,000,000 bath (1,800,000 US$)
The Factory is served for the mold which support the car spare parts manufacture.
Client : Sombon Spring Co.,Ltd
Location : Bangkok, Thailand
Design Period : 1993 - 1994
Approx.Assignment Budget : 50,000,000 bath (1,250,000 US$)
ECCO Tannery, design focuses on safety and environment preservation which shown high that high-efficiency following high standard of design.
Client : ECCO (Thailand) Co.,Ltd.
Location : Saharat Nakorn Industrial Estate, Thailand
Design Period : February - April 1999
Approx. Value of Services : 3,500,000 bath (87,500 US$)
Approx.Assignment Budget : 116,000,000 bath (2,900,000 US$)
Anti-Pests against Plants Manufacture Factory which emphasize the Quality of the Products and Safety of progress.
Client : Thepwattana Chemical Industry
Location : Bang Poo Industrial Estate, Thailand
Design Period : January – March 2000
Approx. Value of Services : 600,000 bath (15,000 US$)
Approx. Assignment Budget : 40,000,000 bath (1,000,000 US$)
Electronic part showroom and manufactory. Construction consulting was provided by Future Engineering Consultants.
Client : Star Royal Industry Co.,Ltd.
Location : Phutthamonthol 5 km 3, Nakornpathom Province, Thailand
Design Period : January 2001 – January 2002
Approx. Value of Services : 1,800,000 bath (45,000 US$)
Approx. Assignment Budget : 60,000,000 bath (1,500,000 US$)
Incinerator Plant not only be able to eradicate useless garbage efficiently, It also can create an electrical power from the process itself.
Client : Provincial Administrative Organization of Cholburi Province
Location : Cholburi Province Thailand.
Construction Management Period : July - December 2004
Approx.Value of Services : 5,800,000 baht (145,000 US$)
Approx.Assignment Budget : 620,000,000 baht (1,550,000 US$)
Electronic part manufactory. Checking post and loading dock design including value engineering study and administration office interior modification design was provided by Future Engineering Consultants Co.,Ltd.
Client : Wyncoast Industrial Park Publick Co.,Ltd.
Location : Chachoengsao Province, Thailand
Design Period : February – April 2005
Approx.Value of Services : 300,000 baht (7,500 US$)
Approx.Assignment Budget : 20,000,000 baht (500,000 US$)
“Honda” car spare parts manufactory which can be served for the Honda customer services, especially in the spares warehouse restoration. Emphasize to the Honda high standard and factory safety.
Client : Blue Cons Asia Co.,Ltd.
Location : Phranakorn Sriayuthaya Province, Thailand
Design Period : March – August 2005
Approx. Value of Services : 900,000 baht (22,500 US$)
Approx. Assignment Budget : 55,000,000 baht (1,375,0 00 US$)
RIST Electronic parts manufactory, FEC take responsibility for the quality control and inspection to meet an acceptable international standard.
Client : ROHM Integrated Systems (Thailand) Co.,Ltd.
Location : Navanakorn Industrial Estate Patumthani Province, Thailand
Design Period : March – November 2006
Approx. Value of Services : 1,260,000 baht (31,500 US$)
Approx. Assignment Budget : 1,000,000,000 baht (25,000,000 US$)
Factory for manufacturing of Aluminum package and ware house number 8. The design is based on GMP Standard.
Client : Alucon Public Co.,Ltd.
Location : Borwin Sriracha, Chonburi Province, Thailand
Design Period : August2010 – November 2011
Approx. Assignment Budget : 339,341,000 baht
Factory for manufacturing of Aluminum package and ware house number 9. The design is based on GMP Standard.
Client : Alucon Public Co.,Ltd.
Location : Borwin Sriracha, Chonburi Province, Thailand
Design Period : August2010 – September 2011
Approx. Assignment Budget : 742,680,000 baht
Design for Civil and architectural part of SAN 3 project and prepare for the permission drawings.
Client : IRPC Public Company Limited
Location : Mueng , Rayong Province, Thailand
Design Period : Sep 2011 - Dec 2011
Budget : 1,800,000,000 baht (60,000,000 US$)
Design for Civil and architectural part of Green ABS project and prepare for the permission drawings.
Client : IRPC Public Company Limited
Location : Mueng , Rayong Province, Thailand
Design Period : Sep 2011 - Dec 2011
Budget : 1,800,000,000 baht (60,000,000 US$)
Design for Civil and architectural part of Pilot Flocculation and Drying project which is part of Green ABS project and prepare for the permission drawings
Client : IRPC Public Company Limited
Location : Mueng , Rayong Province, Thailand
Design Period : November 2011 - March 2012
Budget : 200,000,000 baht
Design for Architectural, Structural, System Engineering of New Tankfarm and Port office building and including automatic fire suppression system(inert gas) and positive pressure system.
Client : IRPC Public Company Limited
Location : Mueng, Rayong Province, Thailand
Design Period : September 2011 - January 2012
Approx.Value of Services : 680,000 baht (17,000 US$)
Approx.Assignment Budget : 80,000,000 baht (2,000,000 US$)
Consist of Food product from meat manufacturing GMP standard, meeting room, office and research laboratory.
Client : Ubon Ratchathani University
Location : Warinchamrab,Ubonratchathani Province, Thailand
Design Period : September 2018-November 2018
Budget : 45,200,000 baht
Consist of beverage product from vegetable and fruit manufacturing GMP standard, meeting room , office and research laboratory.
Client : Ubon Ratchathani University
Location : Warinchamrab,Ubonratchathani Province, Thailand
Design Period : April 2020-May 2020
Budget : 60,000,000 baht
Structural design for office and accident control room from blasting of petrochemical plant according to ASCE : blast resistance category II
Client : MAP TA PHUT OLEFINS Co.,Ltd.
Location : Maptaphut, Rayong Province, Thailand
Design Period : January – April 2008
Approx. Value of Services : 193,000 baht (5,850 US$)
Approx. Assignment Budget : 10,000,000 baht (303,030 US$)
Design for architecture, interior and partial of building system for control room of IRPC CHP power plant with capacity of 240 mw
Client : IRPC Public Co.,Ltd.
Location : Rayong Province, Thailand
Design Period : 22 June – 6 July 2009
Approx. Assignment Budget : Overall budget 8,700 million THB
Overall design for the Tank farm control and office building near to the IRPC sea port. Control room enclosed by blast resistant wall which allow the staff to operate during the unexpected situation.
Client : IRPC Public Company Limited
Location : Rayong Province, Thailand
Design Period : September 2011 – January 2012
Approx. Assignment Budget : Building budget 80 Million THB
Design for architecture, interior and partial of building system for control room of IRPC CHP2 powerplant with capacity of 240 mw
Client : IRPC Public Company Limited
Location : Rayong Province, Thailand
Design Period : June 2012 – January 2013
Construction Completion : August 2017
Budget : overall budget 14,000 million THB
Design for architecture, interior and engineering system for control room of the petrochemical plant.
Client : Thai Paraxylene Company Limited
Location : Chonburi Province, Thailand
Design Period : 2014
Construction Completion : 2014
Approx. Assignment Budget : 3,500,000 baht
Design for architecture, interior and lighting system for control room of petrochemical refinery with capacity of 160 tons/hour
Client : IRPC Public Company Limited
Location : Rayong Province, Thailand
Design Period : January 2016 – March 2016
Construction Completion : March 2016
Approx. Assignment Budget : 6,350,000 baht
RENOVATION OF RADIOLOGY DEPARTMENT, PHOR POR ROR BUILDING, 4th FLOOR CHULALONGKORN HOSPITAL, THAI RED CROSS SOCIETY
RENOVATION OF THE OPERATION AREA, EXCELLENCE CENTER FOR STEM CELL AND CELL THERAPY, 8C STEMCELL, BHUMISIRIMANGKHALANUSORN BUILDING CHULALONGKORN HOSPITAL, THAI RED CROSS SOCIETY
DEVELOPING WASH TECHNICAL MANUAL FOR THREE STARS SCHOOLS (MYANMAR) : UNITED NATIONS INTERNATIONAL OF CHILDREN EMERGENCY FUND (UNICEF)
HERBAL MEDICINE PRODUCTION AREA IMPROVEMENT DESIGN PROJECT ADULYADEJ VIKROM BUILDING, 13TH FLOOR : MAHIDOL UNIVERSITY
CHALERMPHRAKIAT MEDICAL SERVICE AND RESEARCH CENTER BUILDING (2nd BUILDING) : MAHASARAKHAM UNIVERSITY
NEW CONSTRUCTION OF RADIOTHERAPY, CHEMOTHERAPY BUILDING AND CANCER WITH PARKING BUILDING BHUMIBOL ADULYADEJ HOSPITAL
250 beds hospital which shown the meaning of high standard and quality. Anchored on the principle of clean, convenient and care.
Client : Sotharavej Co.,Ltd.
Location : Chachoengsao Province, Thailand
Design and Construction Supervision Period : April – May 1993
Approx. Value of Services : 6,000,000 baht (150,000 US$)
Approx. Assignment Budget : 350,000,000 baht (8,750,000 US$)
Prachavej hospital which comprise of 220 beds, One of the high-standard hospital situated in Khon Kaen province. The hospital can be served all kinds of medical treatment.
Client : Khon Kaen Hospital
Location : Mueng District, Khon Kaen Province, Thailand
Design Period : January – April 1995
Approx. Value of Services : 600,000 baht (15,000 US$)
Approx. Assignment Budget : 280,000,000 baht (7,000,000 US$)
Improvement and design for construction of 2 storey building comprise of emergency room, OPD, ICU and laboratory sections which can provide the useful space 3,385 square meters.
Client : Lao-Luxembourg Health Initiatives Support Programme Ministry of Health
Location : Khammoune province, Lao People’s Democratic Republic
Design Period : October 2006 – October 2007
Approx. Value of Services : 4,200,000 baht (105,000 US$)
Approx. Assignment Budget : 50,000,000 baht (1,250,000 US$)
The hospital master plan and two new buildings were designed including the building for the general surgery department with 7 beds and the radiology department which connects to the original building with an area of 2,400 square meters and an inpatient ward building with a size of 120 beds and an area of 3,300 square meters. The various systems were also designed including wastewater treatment system, waste disposal system and others related systems to meet the standard and not harm the environment.
Client : Vientiane Capital, Lao People’s Democratic Republic
Location : Project Management Unit Department of Planning Budgeting Ministry of Health, Lao People’s Democratic Republic
Design Period : October 2006 - October 2007
Approx.Value of Services : 4,200,000 baht (105,00 US$)
Approx.Assignment Budget : 130,800,000 baht (3,270,000 US$)
The hospital master plan was designed along with a 200-seat education and seminar building, a computer lab and a library with an area of approximately 1,700 square meters. Those were the new buildings of the Faculty of Medicine and Health Sciences. Other 4 buildings were also renovated which include the Obstetrics Department, Administration and Service Department General Surgery Department, Radiology Department, Orthopedic Department, Brain and Spinal Cord Outpatient Department, Inpatient Department, Medical Technology Department and Dental Department, with a total area of not less than 8,000 square meters
Client : Project Management Unit Department of Planning Budgeting Ministry of Health Lao People’s Democratic Republic
Location : Vientiene Capital, Lao People’s Democratic Republic
Design Period : October 2006 – October 2007
Approx. Value of Services : 4,200,000 baht (105,000 US$)
Approx. Assignment Budget : 130,800,000 baht (3,270,000 US$)
Design the master plan and the renovation of a 4-storey building with an area of approximately 6,000 sq.m., lecture and laboratory building of Faculty of Medicine and Faculty of Dentistry. The usage of the building, electrical system, water supply system, wastewater treatment system and the exterior was redesigned.
Client : Project Management Unit Department of Planning Budgeting Ministry of Health Lao People’s Democratic Republic
Location : Vientiene Capital, Lao People’s Democratic Republic
Design Period : October 2006 – October 2007
Approx. Value of Services : 4,200,000 baht (105,000 US$)
Approx. Assignment Budget : 130,800,000 baht (3,270,000 US$)
The master plan design was designed and the preliminary design was provided for the new building which consists of Radiology Department with an area of approximately 1,500 square meters. The other two original buildings were also designed and renovated, which are the Outpatient Department building and the Pharmacy and Obstetrics Department Building. The project has the area of approximately 700 square meters. The wastewater treatment system was also designed.
Client : Project Management Unit Department of Planning Budgeting Ministry of Health Lao People’s Democratic Republic
Location : Vientiene Capital, Lao People’s Democratic Republic
Design Period : October 2006 – October 2007
Approx. Value of Services : 4,200,000 baht (105,000 US$)
Approx. Assignment Budget : 41,200,000 baht (1,030,000 US$)
Renovation and separation of traumatology section from emergency section which comprise of 10 beds, 2 resusticate beds following to phase expansion planning.
Client : Bhumibol Adulyadej Hospital
Location : Bhumibol Adulyadej Hospital, Bangkok, Thailand
Design Period : September – November 2008
Approx. Value of Services : 400,000 baht (10,000 US$)
Approx. Assignment Budget : 17,000,000 baht (425,000 US$)
Design for radiotherapy building with 2 set of LINAC installation and supporting facilities, Chemotherapy building including 7 storey parking lot to meet international standard efficiently and adequately.
Client : Bhumibol Adulyadej Hospital
Location : Bhumibol Adulyadej Hospital, Bangkok, Thailand
Design Period : September – November 2008
Approx. Value of Services : 1,600,000 baht (40,000 US$)
Approx. Assignment Budget : 223,000,000 baht (5,575,000 US$)
Laboratory and Animal Hospital to support clinical learning for students and veterinary, the center for animal sickness consultant and treatment by specially remedy and expert, and also to support the clinical research for related people.
Client : Mahasarakham University
Location : Amphoe Kantharawichai, Mahasarakham Province, Thailand
Design Period : May - August 2009
Budget : 151,900,000 baht (3,797,500 US$)
Survey and design of patient ward which useful 1,900 square meters for 70 beds capacity including waste water treatment system design.
Client : Project Management Unit Department of Planning Budgeting Ministry of Health
Location : Vientiene Capital, Lao People’s Democratic Republic
Design Period : July – November 2009
Approx. Value of Services : 632,000 baht (15,800 US$)
Approx. Assignment Budget : 20,000,000 baht (500,000 US$)
Center for medical service to general people especially northeast area and to support medical learning and Applied Thai Traditional Medicine learning.
Client : Mahasarakham University
Location : Amphoe Mueang Mahasarakham , Mahasarakham Province, Thailand
Design Period : September - December 2009
Budget : 202,000,000 baht (5,050,000 US$)
District Hospital design in The infrastructure Consulting Engineering Firm for Health Infrastructure and Maintenance Advisory Services Project in accordance with the cooperation between The Ministry of Health, Lao PDR and Luxembourg Agency for Development Cooperation (Lux-Dev). The firm have worked with the architect consultancy from Lux-Dev and KPP Design Co.,ltd. the Lao joint venture firm. The district hospital type are located on difference sites, Hongxai at Bolikhamsay province and Namdone at Bolikhamsay province.
Client : Lux-Dev and Ministry of Health, Medical Products Supply Center, Lao PDR
Design Period : 2012
Budget : - 450,000 Euro for Feuang and Kasi hospital
- 275,000 Euro for Pakkading Hospital
Rural Health Center and Urban Health Center design in “The infrastructure Consulting Engineering Firm for Health Infrastructure and Maintenance Advisory Services Project” in accordance with the cooperation between The Ministry of Health, Lao PDR and Luxembourg Agency for Development Cooperation (Lux-Dev). The firm have worked with the architect consultancy from Lux-Dev and KPP Design Co.,ltd. the Lao joint venture firm.
The Rural Health Center type are located on 8 difference sites at Vientiane province, Bolikhamsay province and Khammouane provice. And The Urban Health Center type are located on 2 difference sites at Vientiane province, Bolikhamsay province and Khammouane provice.
Client : Lux-Dev and Ministry of Health, Medical Products Supply Center, Lao PDR
Location : Rural Health Center;
- Muan, Phabong at Vientiane province
- Nakham, nateuy and Pakkading at Bolikhamsay province
- Phonemeuang, Naphao and Kayou at Khammouane province
Urban Health Center;
- Hongxai at Bolikhamsay province
- Namdone at Khammouane province
Design Period : 2012
Area : 51,500 sqm.
Budget : Rural Health Center;
- 480,000 Euro
Urban Health Center;
- 275,000 Euro
Ar Yu International Hospital project consists of 14 Storey (184 beds), Radiotherapy (2LINAC), ER MED. Clinic, OB-GYN, Pedriatric, X-Ray, MRI, Wellness Center OR, Delivery, 16 ICU-CCU/CATII Lab. Hemodialysis Center, Physical Therapy, Endoscope, Nursery, Ward (215 beds), Night OPD, Surgical, Orthopedics, Radiology, Mammogram, CSSD and other support facilities. Including Electrical Building 4 floors and 9 floors of car parking building.
Client : Consortium of Thonburi Hospital Group (THG) and Ga Mone Pwint (GMP) co., Ltd.
Location : Yangon, Myanmar
Construction Period : May 2016 – December 2017
Approx.Assignment Budget : 2,450,000,000 baht (80,000,000 US$)
The renovation and modification on UNCC building, Economics and Social Commission for Asia and the Pacific (ESCAP), United Nations, Bangkok, Thailand. The objective of the project is provide more efficiency area for ESCAP Library that the current area are not suitable with requirements. Total area are approximately 360 sq.m for the garden and approximately 1,400 sq.m Building area with 3 floor levels. 2 levels are library’s area consist of exhibition hall, library, collaboration rooms and library’s office. And the third level is dining area that is connected with the current restaurant.
Client : UNICEF
Location : Bangkok, Thailand
Design Period : October 2016 – January 2017
Approx. Assignment Budget : 88,000,000 baht
The Construction of 11-storey and 5-basement storey of private hospital with building area are approximately 81,000 sq.m. The Hospital include X-ray room , CT scan, ER, OPD, Dental, GI/Endoscope, IVF, Surgical, Plastic Surgery, OR, ICU, Ward 150 beds , Laboratory, Office , CSSD, and other support facilities.
Client : Thonburi Healthcare Group Public Company Limited
Location : 611 Bumrungmuang rd. Khwang Klong Mahanak, Pom Prap Sattru Phai, Bangkok, Thailand
Construction Period : August 2017 – December 2018
Budget : 1,500,000,000 baht (Approx 50,000,000 USD)
The special co-housing project for the elderly people that provide necessary elder care service with a professional health care staffs 24 hours. Total area are approximately 22,000 sq.m consist Health check up area Gym Pray room and Recreation area.
Client : Thonburi Healthcare Group Public Company Limited
Location : Pracha Uthit 60 rd. Thung Khru, Bangkok, Thailand
Design Period : March 2018 – December 2018
Budget : 382,000,000 baht (Approx 12,169,480 USD)
improve herbal medicine production area To raise the quality standard of herbal medicine production to be certified at the national level. and abroad and complies with GMP and PIC/S standards, with a usable area of approximately 557 square meters, with details of the design consisting of:
- Architecture
- Structural work
- electrical and communication systems
- Air conditioning and ventilation system work
- Clean Room system and GMP system according to standard for pharmaceutical production room
Client : Consortium of Thonburi Hospital Group (THG) and Ga Mone Pwint (GMP) co., Ltd.
Location : Yangon, Myanmar
Construction Period : April 2016 – February 2018
Area : 51,500 sqm.
Budget : 2,450,000,000 baht (Approx. $70,000,000 USD)
Contract : FEC/W2016-12-01
The Quality of Life People Development Canter in Nong Prue Subdistrict is a 3-storey building with a total area of approximately 7,085 square meters. It consists of a car park, a reception hall, a meeting room, a swimming pool, a kitchen, a physical therapy room, a training room, welfare fund room, karaoke room, computer room, yoga room, rhythmic activity room, Chinese medicine room, day rest room for the elderly, women toilet, men toilet and various support areas.
Client : Nongprue Subdistric Administrative Organization Bangpliee District Samutprakan
Location : Moo1, Nongprue, Bangpli District, Samutprakan, Thailand
Design Period : September 2020 – March 2021
Budget : 250,000,000 baht
Design and Technical manual implementation for WASH (Water Sanitation and Hygiene Facilities) in Schools. The facilities includes water supply, toilet and handwashing facilities, wastewater treatment, waste management, school canteen area and emergency WASH facilities.
Client : UNICEF (Myanmar)
Location : Myanmar
Design Period : October 2020 – March 2022
Approx. Assignment Budget : Depends on selected facility
The 29-storey hospital building divided into zone A, B, C, D. It is the largest hospital building in ASEAN and is a medical excellence center which is fully equipped with medical services according to international standards. The renovated area located on the 8th floor, zone C, Bhumisirimangkanusorn Building. The purpose of the renovation is to support stem cell and cell therapy. In the area of 250 square meters, the space is formatted to effectively support the usage, study, research, development of stem cell. It is equipped with adequate stem cell research facilities with electrical communication systems, air conditioning and ventilation systems, sanitation and fire suppression systems, etc.
Client : King Chulalongkorn Memoria Hospital
Location : Rama 4 Road, Pathumwan, Bangkok Thailand 10330
Construction Period : December 2020 – May 2021
Budget : 19,900,000 baht
The renovation of the radiology department, Por Por Ror Building, 4th floor, with an area of about 330 square meters, comprising of architecture and interior work, electrical and communication electrical engineering work and fire suppression system and medical gas system work. The architecture and interior works include demolition of the original changing room to be installed in a new area (as specified in the drawing), demolition of the original wall and ceiling in the area, the installation of the lead wall for the lung X-RAY room (as specified in the drawing).
The electrical and communication electrical engineering works include the demolition of the original communication system in the area, procurement and installation of electrical system, telephone system, television system, announcement sound system, fire alarm system, CCTV system, access control system, computer system, nurse call system, intercom system, emergency lighting and emergency exit signs, air conditioning and ventilation system and sanitary system.
The fire suppression system and medical gas system works include the demolition of the original sanitation system, fire suppression and medical gas system in the area, supply and install sanitary system, fire suppression system and medical gas system according to the document, model and specification, etc.
Client : King Chulalongkorn Memoria Hospital
Location : Rama 4 Road, Pathumwan, Bangkok Thailand 10330
Construction Period : December 2020 – May 2021
Budget : 10,856,000 baht
HIRING ENGINEERING CONSULTANT TO SURVEY AND DESIGN A 4-LANE HIGHWAY ON HIGHWAY NO. 12, LOM SAK DISTRICT - KHON SAN DISTRICT
HIRING ENGINEERING CONSULTANT TO SURVEY AND DESIGN INTERCHANGE OF HIGHWAY NO. 1 AND RURAL ROAD NO. 1418 (CHIANG RAI AIRPORT ENTRANCE)
RC. BRIDGE FOR BANG NAM JEURD CANAL AND BANGNA CANAL : NONG PRUE SUB-DISTRICT ADMINISTRATIVE ORGANIZATION
MASTER PLAN & FEASIBILITY STUDY AND FLOOD PROTECTION DESIGN FOR MUENG AND KAMNERDNOPPHAKHUN MUNICIPALITY IN PRAJUABKHEREKHAN PROVINCE
The Southern Shortcut Motorway will provide the better solution for traveling and transporting to the southern region. The Route will be built almost elevated and lie over the Gulf of Thailand from Samutsakorn to Cha-am.
Future Engineering Consultant took respondsibility of All Toll Systeam Buildings including Toll Collections and weight operation.
Client : Department of Highways, Ministry of Transports, Thailand
Location : Middle of Southern Region
Design Period : October 2004 - December 2005
Approx.Value of Services : 350,000 baht (8,750 US$)
Approx.Assignment Budget : 55,000,000,000 baht (1,375,000,000 US$)
The BTS expansion route were prefered to relieve the traffic congestion in the middle of Bangkok through the circumference. The route comprise with elevated route and Underground which can be joined to another line property.
Client : Department of Traffic and Transportation, Thailand
Location : Bangkok and the circumference
Design Period : February - October 2005
Approx.Value of Services : 210,000 baht (5,250 US$)
Approx.Assignment Budget : 48,750,000,000 baht (1,218,750,000 US$)
Design for 9 BTS transportation, Coordinate with utillity design consultant co.,ltd. FEC take respondsible for structural design
Client : Department of Traffic and Transportation, Thailand
Location : Bangkok - Samutprakarn, Thailand
Design Period : October 2007 – March 2008
Approx.Assignment Budget : 2,700,000,000 baht
Design for waste water treatment and sludge management within the hospitals, including waste water route network and treatment system in Mahosot hospital and Mittaphab hospital in Vientiene Capital city, Lao PDR.
Client : Ministry of Health, Lao PDR
Location : Vientiene Capital City, In Lao PDR.
Design Period : August 2008 – November 2008
Construction of reinforced concrete retaining wall at the Bangchak Petrolium pier. During the construction progress, the piers are partially remain on service.
Client : The Bangchak Petrolium public copany limited
Location : Pier 18A-18F The Bangchak Petrolium public copany limited Phrakanong district, Bangkok Thailand.
Construction Management Period : November 2008 - July 2009
Approx.Assignment Budget : 49,000,000 baht (1,225,000 US$)
Client : Department of Public Works and Town & Country Planning
Location : Yala and Betong municipality, Yala Province Thailand.
Design Period : August 2009 - November 2010
Approx.Value of Services : 6,040,000 baht (172,571 US$)
Approx.Assignment Budget : 1,352,000,000 baht (33,800,000 US$)
Client : Department of Public Works and Town & Country Planning
Location : Mukdahan municipality, Mukdahan province Thailand.
Design Period : August 2009 - January 2011
Approx.Value of Services : 19,926,320 baht (498,158 US$)
Approx.Assignment Budget : 3,073,942,000 baht (76,848,550 US$)
Design for water supply plant in 5 provinces of Cambodia. The construction is included Sludge Tank, Filter Tank , Clarify Tank, Elevated Storage Tank, High Pressure Pump Station, Plant Office, Chemical Storage and Staff Resident.
Location :
1. Kampong Speu Province
2. Prey Veng Province
3. Svay Rieng Province
4. Tbeng Meanchey, Preah Vihear Province
5. Rovieng, Preah Vihearr Province
In Cambodia.
Client : Khmer Development Foundation (KDF) and Association of Humanity and Religion Development (AHURD-NGO)
Design Period : January 2010 – April 2010
Approx.Assignment Budget : 46,000,000 USD
Client : Department of Public Works and Town & Country Planning
Location : Mueng and Kamnerdnopphakhun Municipality, Prajuabkherekhan Province, Thailand
Design Period : July 2010 - November 2011
Approx.Value of Services : 16,000,000 baht (457,142 US$)
Approx.Assignment Budget : 954,000,000 baht (27,257,142 US$)
Design and modification of EIA pond for treated water inspection before discharge to the public drainage system. The design is including renovation of existing pumphouse with new pump installation, hexagonal pavillion and landscape design to facilitate external visitor.
Location : Mueng District, Rayong Province, Thailand
Client : IRPC Public Company Limited
Design Period : August - December 2010
Approx.Value of Services : 425,000 baht (10,625 US$)
Approx.Assignment Budget : 56,800,000 baht (1,420,000 US$)
Design for water supply plant in Luangphrabang Province in Lao PDR. The construction is included Sludge Tank, Filter Tank , Clarify Tank, Elevated Storage Tank, High Pressure Pump Station, Plant Office, Chemical Storage and Staff Resident
Client : Asia Nampapa Luangphrabang Ltd.
Location : Luangphrabang Province, Lao PDR
Design Period : November 2012 - January 2012
Approx. Assignment Budget : 4,500,000 USD
Design for a 4 lanes road with 24 m. width and approximately 2,300 m. length with a walkway and a bicycle lane. The design included landscape design, his majesty the king commemorative gate and bus stops.
Client : Nong Prue Subdistrict administrative organization
Location : Samutprakarn Province , Thailand
Design Period : January - November 2021
Approx.Assignment Budget : 232,000,000 baht
Design for a 4 lanes bridge with decoration and installation of support facilities including toilet, bicycle parking and scenic area.
Client : Nong Prue Subdistrict administrative organization
Location : Samutprakarn Province , Thailand
Design Period : January - September 2021
Approx.Assignment Budget : 53,750,000 baht
Survey and design details as well as prepare the documents for tendering and appraisal for the interchange of Highway No. 1 and Rural Road No. 1418 (Chiang Rai Airport entrance) for the project development to be in accordance with engineering standards and in line with environmental, economic and social conditions.
Client : Department of Highways
Location : Chiang Rai Province, Thailand
Design Period : March 2022 – February 2023
Approx.Assignment Budget : 130,960,179.99 baht
Survey and design details for a 4-lane highway on Highway 12, Lom Sak District - Khon San District, to be in accordance with academic principles and professional standards in engineering, traffic analysis, environmental impact studies, public participation and relevant legal provisions.
Client : Department of Highways
Location : Thailand
Design Period : March 2022 – May 2023
Survey and design of standard steel bridge design for highways, along with preparing a material quantity account and standard manual documents to be used in the design, cost estimation and road construction for the Department of Highways.
Client : Department of Highways
Location : Thailand
Design Period : December 2022 – June 2024
The two stations of BTS skytrain located at Krungthonburi road, including rail and rail system for approximately 2.2 km. FEC and Utillity Design Consultant Co.,Ltd take responsibility as construction consultant of the project.
Client : Bangkok Metroprolitan Admistration of Thailand
Location : Krungthonburi road, Bangkok
Construction Management Period : On the progress
Approx.Assignment Budget : 1,033,000,000 baht (25,,825,000 US$)
INTERNATIONAL ISLAMIC LEARNING AND INFORMATION COMPLEX BUILDING : PRINCE OF SONGKLA UNIVERSITY PATTANI CAMPUS
CENTRAL LECTURE AND LABORATORY BUILDING FACULTY OF AGRICULTURAL INDUSTRIAL TECHNOLOGY: MAHASARAKHAM UNIVERSITY
8 storey chancellor office and central lecture building, which consist of many functions which include student union, standard classroom and 300 seats seminar room.
Client : Rajabhat Loei University
Location : Loei Province, Thailand
Design and Construction Supervision Period : February – May 1997
Approx. Value of Services : 1,160,000 baht (29,000 US$)
Approx. Assignment Budget : 65,000,000 baht (1,625,000 US$)
An outstanding identity building especially its combination of information technology function and vernacular characteristic.
Project : Building No. 317 Renovation
Client : Rajabhat Loei University
Location : Loei Province, Thailand
Design Period : September – December 1999
Approx. Value of Services : 1,267,500 baht (31,688 US$)
Approx. Assignment Budget : 70,000,000 baht (1,750,000 US$)
Lecture and operation building consist of various facilities e.g. 25 classrooms, mass medias laboratory, instructor office and standard convention hall to accommodate learning facilities for new generation.
Client : Udornthani Rajabaht University
Location : Mueng, Udonthani Province, Thailand
Design Period : December 1999 – January 2000
Approx. Value of Services : 1,425,000 baht (35,625 US$)
Approx. Assignment Budget : 80,000,000 baht (2,000,000 US$)
Consist of lecture room, Laboratory for learning and teaching to students of the University
Client : Chandrakasem Rajabhat University
Location : Chatuchak , Bangkok
Design Period : During Construction 2000
Budget : 280,000,000 baht
Consist of university office, rector office, grand meeting room and university council meeting room to facilitate for administration and communication in the university.
Client : Lampang Rajabhat University
Location : Meung, Lampang Province, Thailand
Design Period : During Construction 2000
Budget : 98,300,000 baht
Consist of lecture room, Laboratory for learning and teaching to students of the University.
Client : Lampang Rajabhat University
Location : Meung,Lampang Province, Thailand
Design Period : During Construction 2000
Budget : 348,572,000 baht
Consist of lecture room, Laboratory for learning and teaching to students of the University.
Client : Phuket Rajabhat University
Location : Meung , Phuket Province, Thailand
Design Period : During Construction 2000
Budget : 240,000,000 baht
Consist of lecture room, Laboratory for learning and teaching to students of the University.
Client : Surindra Rajabhat University
Location : Meung,Surindra Province, Thailand
Design Period : During Construction 2000
Budget : 120,000,000 baht
Consist of lecture room, Laboratory for learning and teaching to students of the University.
Client : Sakon Nakhon Rajabhat University
Location : Meung,Sakon Nakhon Province, Thailand
Design Period : During Construction 2000
Budget : 180,000,000 baht
Consist of lecture room and multipurpose area for learning and teaching to students of the University.
Client : Kamphaeng Phet Rajabhat University
Location : Meung,Kamphaeng Phet Province, Thailand
Design Period : During Construction 2000
Budget : 150,000,000 baht
Consist of lecture room, Laboratory for learning and teaching to students of the University.
Client : Nakhonratchasima Rajabhat University
Location : Meung,Nakhonratchasima Province, Thailand
Design Period : During Construction 2000
Budget : 280,000,000 baht
Consist of lecture room, Laboratory for learning and teaching to students of the University.
Client : Surindra Rajabhat University
Location : Meung,Surindra Province, Thailand
Design Period : During Construction 2000
Budget : 167,110,000 baht
Consist of lecture room, and Aviation simulation room.
Client : Nakhon panom University
Location : Meung,Nakhon panom Province, Thailand
Design Period : During Construction
Budget : 30,000,000 baht
Interior Modification and Exterior improvement for additional classroom office and seminar which concerning about condition of existing facilities.
Client : Asian Institute of Technology (AIT)
Location : Klong Luang, Pathumthani Province, Thailand
Design and Construction Supervision Period : September – December 2003
Approx. Value of Services : 700,000 baht (17,500 US$)
Approx. Assignment Budget : 10,000,000 baht (250,000 US$)
Lecture room and Laboratories to support increasing number of the classes and new technology experimental equipment.
Client : Mahidol University
Location : Karnchanaburi Province, Thailand
Design Period : March – May 2004
Approx. Value of Services : 1,230,000 baht (30,750 US$)
Approx. Assignment Budget : 71,000,000 baht (2,500,000 US$)
8 storey chancellor office and central lecture building, which consist of many functions which include student union, standard classroom and 300 seats seminar room.
Client : Udornthani Rajabhat University
Location : Mueng, Udornthani Province, Thailand
Design Period : April – May, 2004
Approx. Value of Services : 462,500 baht (11,562.50 US$)
Approx. Assignment Budget : 66,000,000 baht (1,650,000 US$)
Consist of lecture room, Laboratory research for agricultural science, Maha Vachiralongkorn celebration exhibition and to support in Master degree and Doctor degree education.
Client : Faculty of Agricultural Science, Kasetsart University
Location : Bangkhen, Bangkok, Thailand
Design Period : May - September 2004
Approx. Assignment Budget : 157,500,000 bath
Support for student activities apart from learning activity including student union, assembly indoor sport, recreation and canteen.
Client : Rajabhat Karnchanaburi University
Location : Mueng District, Karnchanaburi Province, Thailand
Design Period : January – February 2005
Approx. Value of Services : 1,075,000 baht (26,875 US$)
Approx. Assignment Budget : 60,000,000 baht (1,500,000 US$)
Consist of lecture room , Supporting Activities, Seminar room with 330 seats and education administration office.
Client : Ajabaht Piboonsongkram University 66 Wangchan Rd., Nai Mueng Sub district, Mueng District, Pitsanuloke Province, 65000 Thailand
Location : Pitsanuloke Province Thailand
Design Period : October - December 2005
Budget : 84,000,000 baht (2,100,000 US$)
Two storeys of academic building, polytechnic school under Worldbank funds FEC too responsibility for building design, external works, cost estimation, prepare for tender documents, co-committee to assist to selected of contractor and construction supervision.
Client : Department of Lands, Ministry of Finance Vietiene Lao People’s Democratic Republic
Location : Vientiene, Lao People’s Democratic Republic
Design Period : January – July 2006
Approx. Value of Services : 660,000 baht (16,500 US$)
Approx. Assignment Budget : 8,000,000 baht (200,000 US$)
Center lecture and functional academic consist of 4 floors which comprise of multipurpose area to support both learning and operating activities.
Client : Mahasarakham University
Location : Kantaravichai, Mahasarakham Province, Thailand
Construction Management Period : October 2006 – March 2009
Approx. Value of Services : 2,838,000 baht (70,950 US$)
Approx. Assignment Budget : 97,000,000 baht (2,425,000 US$)
Functional academic 5 floor which comprise of multipurpose area to support both learning and operating activities.
Client : Rajabhat Loei University
Location : Mueng, Loei Province,Thailand
Design Period : March - May 2007
Budget : 126,000,000 baht (3,150,000 US$)
Functional academic 5 storey which comprise of multipurpose area to support both learning and operating activities.
Client : Rajabhat Ubonrachathani University
Location : Rajabhat Ubonrachathani University,Thailand
Design Period : March - May 2007
Budget : 49,000,000 baht (1,225,000 US$)
6 Storey building, comprising various sizes of classrooms including auditorium classroom.
Client : Rajabhat Ubonrachathani University
Location : Rajabhat Ubonrachathani University, Thailand
Design Period : June 2007 - November 2008
Budget : 69,200,000 baht
Dormitory to accommodate student and instructor of university.
Client : Rajabhat Sakonnakorn University
Location : Mueng, Sakonnakorn Province, Thailand
Design Period : June 2007- November 2008
Budget : 69,200,000 baht
4 storey building which server for local wisdom learning including innovation media development for education to improve learning efficiency.
Client : Mahasarakham University
Location : Kantaravichai , Mahasarakham Province, Thailand.
Design Period : November 2007 - January 2008
Budget : 101,300,000 baht (2,532,500 US$)
Consist of lecture room, Laboratory for learning and teaching to students of the University.
Client : Mahasarakham University
Location : Kantaravichai , Mahasarakham Province, Thailand.
Design Period : November 2007 - January 2008
Budget : 101,300,000 baht (2,532,500 US$)
6 storey building which integrated multi-function area to support language and computer learning.
Client : Rajabhat Udornthani University
Location : Mueng,Udornthani Province, Thailand.
Design Period : November 2007 - February 2008
Budget : 90,000,000 baht
Dormitory to accommodate student and instructor of university.
Client : Rajabhat Sakonnakorn University
Location : Mueng District, Sakonnakorn Province, Thailand
Construction Management Period : January 2008 – February 2010
Approx. Value of Services : 930,000 baht (23,250 US$)
Approx. Assignment Budget : 58,980,000 baht (1,474,500 US$)
5 storey building which comprise of lecture and seminar room capacity 500, 300, 150 through 40 seats including education supporting facilities to encourage and publicize about thai culture , education and background of university and Wat Phra Si Mahatat.
Client : Rajabhat Phranakorn University
Location : Bangkok, Thailand.
Design Period : January 2008-April 2008
Budget : 300,000,000 baht (7,500,000 US$)
Functional academic 5 floor which comprise of multipurpose area to support both learning and operating activities.
Client : Prince of Songkla University
Location : Mueng District, Pattani Province, Thailand
Design Period : June – January 2009
Approx. Value of Services : 4,175,374.01 baht (104,384.35 US$)
Approx. Assignment Budget : 125,976,300 baht (3,149,407.50 US$)
Consist of various size of classroom, operational room, multi-purpose meeting room cantten and college office.uuniversity council meeting room and broadcasting center to facilitate for administration and communication in the university.
Client : Nakhon Panom University
Location : Mueng, Nakhon Panom Province,Thailand
Design Period : October 2008 - July 2010
Budget : 129,888,000 baht
Biotechnology research and laboratory of the university, consist of various facilities to support for researcher and post-graduated students which are biotechnology, agricultural technology, physic, chemistry and nanotechnology, including supporting facilities.
Client : Ubonrachathani University
Location : Varinchamrach,Ubonrachathani Province, Thailand
Design Period : January - April 2009
Budget : 121,000,000 baht
Consist of classroom, university office, rector office, university council meeting room and broadcasting center to facilitate for administration and communication in the university.
Client : Nakhon Panom University
Location : Mueng, Nakhon Panom Province,Thailand
Design Period : February - April 2009
Budget : 80,000,000 baht
The 5-storey building consist of central lecture rooms and laboratory to facilitate academic functions to the staff and students of Faculty of Public Health.
Client : Mahasarakham University
Location : Mueng, Mahasarakham Province , Thailand
Design Period : February - June 2009
Budget : 250,000,000 baht
This building is support to lecture, research, and medical laboratory for students and staffs of the university.
Client : Songkhlanakarin University
Location : Hadyai, Songkhla Province, Thailand
Design Period : September 2009 - January 2010
Budget : 535,000,000 baht
Lecture and Field operation training for Faculty of Nursing student which consist of Administration office, lecture room , Laboratory and Library.
Client : Ubonratchathani University
Location : Warinchamrab, Ubonratchathani Province, Thailand
Design Period : December 2012 - March 2013
Budget : 72,800,000 baht
6 stories building, a residence for teachers and staff of the university.
Client : Kamphaeng Phet Rajabhat University,
Location : Mueng, Kamphaeng Phet Province,Thailand
Design Period : January - March 2013
Budget : 216,000,000.00 baht
Functional academic 3 floor which comprise of multipurpose area to support both learning and environmental research.
Client : Mahidol University
Location : Mueng, Amnat Charoen Province,Thailand
Design Period : October 2013 - January 2014
Budget : 180,000,000 baht
Functional academic 4 floor which comprise of multipurpose area to support both learning and laboratory.
Client : Mahidol University
Location : Mueng, Amnat Charoen Province , Thailand
Design Period : October 2013 - January 2014
Budget : 100,000,000 baht
Consist of Education building , Sport Complex building and Dormitories to facilitate academic function to the staff and student.
Client : Asian University Banglamung District , Chonburi Province, Thailand
Location : Banglamung , Chonburi Province, Thailand
Design Period : June 2014
Budget : 281,300,000 baht
Consist of Kindergarten and Elementary classroom , Soft Surface room Meeting Hall, Professional training room, Smart classroom and Instructor office.
Client : Valayaalongkorn Rajabaht University
Location : Valayaalongkorn Rajabaht University, Thailand
Design Period : August 2010 - October 2011
Budget : 129,000,000 baht
Consist of classroom , Professional training room, Smart classroom and Instructor office.
Client : Phuket Rajabaht University
Location : Phuket Rajabaht University, Thailand
Design Period : October 2016 - February 2017
Budget : 8,775,000 baht
Consist of classroom, Professional training room, Smart classroom and Instructor office.
Client : Phuket Rajabaht University
Location : Phuket Rajabaht University, Thailand
Design Period : October 2016 - February 2017
Budget : 8,775,000 baht
Consist of classroom , Professional training room, Smart classroom and Instructor office.
Client : Ubonratchathani Province, Thailand
Location : Ubonratchathani University
Design Period : August - October 2019
Budget : 6,950,000 baht
A 3-storey building with an area of approximately 1,260 sq.m. The building consists of a kitchen, a teacher office, an educational playroom, a dining room, kindergarten classrooms, elementary classrooms, women toilets, men toilets and supporting areas.
Client : Nongprue Subdistric Administrative Organization, Bangpliee District, Samutprakan
Location : Moo1, Nongprue, Bangpli District, Samutprakan, Thailand
Design Period : September 2020 – March 2021
Budget : 250,000,000 baht
Consist of lecture room, Laboratory for learning and teaching to students of the University
Client : Sakon Nakhon Rajabhat University
Location : Meung,Sakon Nakhon Province, Thailand
Design Period : During Construction 2000
Budget : 72,857,000 baht
About the construction supervision for interior renovation and decoration of 2 headoffice, Sathorn headoffice and Langsuan headoffice including the branch office in Bangkok and Provincial. The scope including, the systems work and built-in fumiture modification.
Client : Bankthai Public Co.Ltd.
Location : Bangkok Head offices, Branches and Provincial Branches
Design Period : September 2003–May 2004
Switching Center & Data Center building in the area approximately 1,200 sqm. The area is white space for IT equipment installation.
Client : AIS
Location : Songkla Province, Thailand
Work Period : 2014
Project management and construction management for interior renovation of SCG Headquarter, Prachachuen road to facilitate each departments in the head office.
Client : Siam Cement Group PLC.
Location : Bangkok, Thailand
Design Period : August 2014 – March 2015
Approx.Assignment Budget : 12,500,000 baht
Office and data center (Tier III) for Bank of Thailand which consists of 4 storey office building, 4 storey of residential building and 2 storey of house and architectural landscape work.
Client : Bank of Thailand
Location : Khonkaen Province, Thailand
Construction Period : August 2014 – February 2017
Approx. Value of Services : 11,869,000 baht
Approx. Assignment Budget : 361,299,000 baht (9,032,475 ,US$)
Project management and construction management for interior renovation of SCG Headquarter, Prachachuen road to facilitate each departments in the head office.
Client : Siam Cement Group PLC.
Location : Bangkok, Thailand
Design Period : November2014 – January 2015
Approx.Assignment Budget : 9,480,000 baht
Project management and construction management for interior renovation of SCG Headquarter, Prachachuen road to facilitate each departments in the head office.
Client : Siam Cement Group PLC.
Location : Bangkok, Thailand
Design Period : January 2015 – February 2015
Approx. Assignment Budget : 2,250,000 baht
Project management and construction management for interior renovation of SCG Headquarter, Prachachuen road to facilitate each departments in the head office.
Client : Siam Cement Group PLC.
Location : Bangkok, Thailand
Design Period : March – June 2015
Approx.Assignment Budget : 37,300,000 baht
Project management and construction management for interior renovation of SCG Headquarter, Prachachuen road to facilitate each departments in the head office.
Client : Siam Cement Group PLC.
Location : Bangkok, Thailand
Design Period : June – October 2015
Approx. Assignment Budget : 5,500,000 baht
Project management and construction management for interior renovation of SCG Headquarter, Prachachuen road to facilitate each departments in the head office.
Client : Siam Cement Group PLC
Location : Bangkok, Thailand
Design Period : July 2015 – September 2015
Approx.Assignment Budget : 3,420,000 baht
Project management and construction management for interior renovation of SCG Headquarter, Prachacheun road to facilitate as new office and related departments.
Client : Siam Cement Group PLC.
Location : Bangkok, Thailand
Design Period : October – December 2015
Approx. Assignment Budget : 5,150,000 baht
Project management and construction management for interior renovation of SCG Headquarter, Prachachuen road to facilitate each departments in the head office.
Client : Siam Cement Group PLC.
Location : Bangkok, Thailand
Design Period : October 2015 – January 2016
Approx.Assignment Budget : 8,800,000 baht
Project management and construction management for interior renovation of SCG Headquarter, Prachachuen road to facilitate each departments in the head office.
Client : Siam Cement Group PLC.
Location : Bangkok, Thailand
Design Period : January – April 2016
Approx.Assignment Budget : 23,000,000 baht
Project management and construction management for interior renovation of SCG Headquarter, Prachachuen road to facilitate each departments in the head office.
Client : Siam Cement Group PLC.
Location : Bangkok, Thailand
Design Period : February – April 2016
Approx.Assignment Budget : 4,000,000 baht
The renovation and modification on UNCC building, Economics and Social Commission for Asia and the Pacific (ESCAP), United Nations, Bangkok, Thailand. The objective of the project is provide more efficiency area for ESCAP Library that the current area are not suitable with requirements. Total area are approximately 360 sq.m for the garden and approximately 1,400 sq.m Building area with 3 floor levels. 2 levels are library’s area consist of exhibition hall, library, collaboration rooms and library’s office. And the third level is dining area that is connected with the current restaurant.
Client : Economics and Social Commission for Asia and the Pacific (ESCAP), United Nations
Location : Rajadamern Nok Ave.Bangkoonprom, Pranakorn, Bangkok, Thailand.
Design Period : October 2016 – February 2018
Consist of 3 floor of office area, meeting room, SMEs showcase, CO-working space, shop, Retail and car parking . With office area approximately 4,400 sq.m. and car parking with area approximately 4,900 sq.m.
Client : Industrial Estate Authority of Thailand
Location : Samut Prakan , Thailand
Design Period : August 2018 – February 2019
Approx. Assignment Budget : 123,000,000 bath
It is a 5-story reinforced concrete building with one basement. The scope of work is supervised the construction of the building in the architectural section Structural engineering Electrical, Computer System Engineering, Air conditioning and ventilation systems, Sanitation and fire fighting systems, Wastewater Treatment, Interior and durable landscape work.
Client : Thailand Institute of Justice
Location : Bangkok , Thailand
Construction Period : February 2019 - Apirl 2021
Approx. Assignment Budget : 498,000,000 baht
The information technology operation center building (Data Center) under New Tier III Standard including other facilities.
Client : KTB Computer Services
Location : Nonthaburi Province, Thailand
Work Period : February 2021
Approx. Assignment Budget : 339,249,000 baht
Data Center (TIER III+) is in the area of Digital Innovation Center and High Technology located in Ban Chang District, Rayong Province, which is used as a model for Thai people data collection business that collects data from the public and private sectors together (Global Cloud) for maximum benefit in business and country development.
Client : EEC Global Cloud
Location : EEC Area, Rayong Province, Thailand
Work Period : November 2021 - August 2022
Approx. AssignmentBudget : 375,000,000 baht
The information technology operation center building (Data Center) under New Tier III+ Standard including other facilities.
Client : True Internet Data Center
Location : Bangkok, Thailand
Work Period : January - June 2022
Approx. Service Fee : 2,880,000 baht
The main information technology operation center building (Data Center) and the secondary information technology operation center building (Disaster Recovery Site), 2 buildings consisting of a computer center and offices including a recreation room, Co-Working area and a video conference meeting room.
Client : Metropolitan Waterworks Authority
Location : Bangkok, Thailand
Design Period : 2023
Approx. Assignment Budget : 290,000,000 baht
8 storey apartment consist of convenient rooms which is the first phase of land development program. The completed program feature will consist of hotel, department store and office building eventually.
Client : Sahussawatland Co.,Ltd. 2/1 Moo 4 Nocgnak Sub district, Nongkhae district, Saraburi Province, Thailand
Location : Saraburi Province, Thailand
Design and Construction Supervision Period : March - July 2003
Approx.Value of Services : 1,200,000 baht (30,000 US$)
Approx.Assignment Budget : 75,000,000 baht (1,875,000 US$)
8 storey apartment consist of many types convenient rooms which is the modern style for every kind of customer.
Client : Sansuk Resident Co.,Ltd. 1939 Moo 3 Sukhumwit Rd., Thaibanmai Sub district, Mueng district, Samutprakarn Province, Thailand
Location : Samutprakarn Province, Thailand
Design and Construction Supervision Period : February - April 2004
Approx.Value of Services : 1,400,000 baht (35,000 US$)
Approx.Assignment Budget : 120,000,000 baht (3,000,000 US$)
5 storey apartment consist of many types convenient rooms which is the modern style for every kind of customer. FEC taking responsibility as a construction supervision.
Client : A C Asset corporation co.,ltd. Phajeenburi Province, Thailand
Location : Bangkok, Thailand
Construction Supervision Period : February - August 2006
Approx.Assignment Budget : 55,000,000 baht (1,375,000 US$)
2 Storey house with thai-modern architecture to accommodate owner’s requirement thelrown style
Client : Mr.Borworn Saereeyothin
Location : Khonkaen Province, Thailand
Construction Management Period : March 2006 - June 2008
Approx.Value of Services : 1,738,000 baht (43,450 US$)
Approx.Assignment Budget : 42,000,000 baht (1,075,000 US$)
2 storey house with thai-modern architecture to accommodate owner’s requirement theirown style.
Client : Mr.Wut Wirhunvorawut
Location : Kalasin Province, Thailand
Construction Management Period : June 2008 - December 2009
Approx.Value of Services : 2,040,000 baht (51,000 US$)
Approx.Assignment Budget : 43,000,000 baht (1,075,000 US$)
9 stories building, a residence for teachers and staff of the university. The residential building consist of 3 different types of rooms.
Client : Loei Rajabhat University
Location : Amphoe Muang, Loei Province,Thailand
Designk Period : November 2008 - January 2009
Budget : 100,000,000 baht
6 stories building, a residence for teachers and staff of the university.
Client : Kamphaeng Phet Rajabhat University
Location : Mueng, Kamphaeng Phet Province,Thailand
Design Period : January - March 2013
Budget : 216,000,000 baht
6 stories building, a residence for teachers and staff of the university.
Client : Nakhonsawan Rajabhat University
Location : Amphoe Muang, Nakhonsawan Province,Thailand
Design Period : October - December 2014
Budget : 108,000,000 baht
7 stories building, a residence for teachers and staff of the university.
Client : Lampang Rajabhat University
Location : Amphoe Muang Lampang, Lampang Province,Thailand
Design Period : October 2014 - January 2015
Approx. Assignment Budget : 250,000,000 baht
10 floors dormitory building consist of 229 rooms each room approximately 40 sq.m. The building also facilitate with multi-purpose room on the first floor and common rooms each floors.
Client : Nakhonratchasima Rajabhat University
Location : Nakornrachasima Province, Thailand
Design Period : July – September 2017
Approx.Assignment Budget : 280,000,000 Baht
The hotel is situated in the heartland of one of Khon Kaen’s busiest streets, Sri Chan. Close to both the airport and railroad station, travelers can conveniently reach Kosa hotel. In the hotel, guests will find deluxe rooms and unparalleled hospitality.
Client : Kosa Hotel
Location : Mueng District, Khon Kaen Province, Thailand
Design Period : 1988
Approx. Assignment Budget : 100,000,000 baht (2,500,000 US$)
Client : Chaipat Hotel
Location : Mueng District, Khon Kaen Province, Thailand
Design and Construction Supervision Period : March – June 2002
Approx. Value of Services : 700,000 baht (17,500 US$)
Approx. Assignment Budget : 70,000,000 baht (1,750,000 US$)
SF Cinema : The Mall Bangkapi Modification Project. FEC took responsibility for its structural design.
Client : SF Cinema
Location : Bangkapi District, Bangkok, Thailand
Design and Construction Supervision Period : February – March 2005
Approx. Value of Services : 40,000 baht (1,000 US$)
Approx. Assignment Budget : 20,000 baht (500 US$)
Twin Lotus, the Resort Hotel, The Best Choice for the recreation among natural surrounding, situated in Lanta Island just in hour away from Krabi province.
Client : Twin Lotus Resort Co.,Ltd.
Location : Lanta Island, Krabi Province, Thailand
Construction Supervision Period : March – August 2005
Approx. Value of Services : 1,430,000 baht (35,750 US$)
Approx. Assignment Budget : 20,000,000 baht (500,000 US$)
Consist of 9 guest room buildings with 5 floors each building, Support facilities building including Business center, Thai restaurant, Italian restaurant, Banquet, All day dining, Spa, Gym, Bar, Swimming pool and sunbathe deck.
Client : TPA Asset Co.,Ltd.
Location : Phuket Province, Thailand
Construction Period : 2019 – 2021
Approx.Assignment Budget : 1,000,000,000 baht
Car parking for internal staff of Toyota company consist of 6 floors including lift and toilet. The building will be constructed for 4 storey at the beginning. FEC take responsibility about project construction management.
Client : Toyota Motor Thailand Co.,Ltd.
Location : Samrong Sub district, Samutprakarn Province, Thailand
Design Period : Construction in progress
Approx. Value of Services : 3,600,000 baht (90,000 US$)
Approx. Assignment Budget : 85,000,000 baht (2,125,000 US$)
Consist of Gymnasium, Football field with stadium, swimming pool and outdoor sport courts.
Client : Lampang Rajabhat University
Location : Mueng, Lampang Province, Thailand
Design Period : March – July 2011
Budget : 155,300,000 baht
Consist of Gymnasium, Football field with stadium, swimming pool and outdoor sport courts.
Client : Loei Rajabhat University
Location : Meung, Loei Province, Thailand
Design Period : January – May 2012
Budget : 180,000,000 baht
Consist of Gymnasium and swimming pool.
Client : Sakon Nakhon Rajabhat University
Location : Meung, Sakon Nakhon Province, Thailand
Design Period : Febuary – May 2012
Budget : 90,000,000 baht
Consist of Football field with stadium, and torch stadium.
Client : Phuket Rajabhat University
Location : Mueng, Phuket Province, Thailand
Design Period : December 2013 – March 2014
Budget : 85,700,000 baht
Consist of Gymnasium, Football field with stadium, swimming pool, outdoor sport courts, and Clubhouse.
Client : Nakhon Sawan Rajabhat University
Location : Meung, Nakhon Sawan Province, Thailand
Design Period : June – December 2015
Budget : 350,000,000 baht
The project had 2 sites which possess different elements and functions. Our planning and design has managed to accommodate the difference and maintain the historical value of both sites.
Client : Mahasarakham Rajabhat University
Location : Nongno, Mahasarakham Province, Thailand
Design Period : May - September 2003
Approx.Value of Services : 2,950,000 baht (73,750 US$)
Approx.Assignment Budget : 3,000,000,000 baht (75,000,000 US$)
Nakornprathom Rajabhat University’s Masterplan is the art of integrating design principle with the vision of education to create academic infrastructure in a compact area.
Client : Nakornprathom Rajabhat University
Location : Nakornprathom Province, Thailand
Design Period : October 1998 - February 1999
Approx. Value of Services : 1,375,000 baht (34,375 US$)
Approx. Assignment Budget : 2,300,000,000 baht (57,500,000 US$)